COMPLETED WORK
The project involves bank protection work along the right bank of Khandakia Khal at Fateh Mohammad Talukdar Para for a length of 150.00 meters using sand–cement. The work aims to prevent erosion, protect the canal bank, and ensure long-term stability. The project started on 15 October 2025 and will be completed by 30 April 2026.
The project involves the construction of CWC-5 at Coatbari, Cumilla Cantonment to support operational and infrastructure requirements of the cantonment area. The project commenced on 15 September 2025 and was completed on 20 December 2025, ensuring timely delivery with required quality and safety standards.
ONGOING WORK
The project involves bank protection work along the right bank of Khandakia Khal at Fateh Mohammad Talukdar Para for a length of 150.00 meters using sand–cement. The work aims to prevent erosion, protect the canal bank, and ensure long-term stability. The project started on 15 October 2025 and will be completed by 30 April 2026.
Parturient ullamcorper et sagittis faucibus dui eu tortor ac parturient ridiculus vel hac condimentum scelerisque libero class.
Pulvinar in dictumst suspendisse ullamcorper cras cum urna eget nibh facilisi eu a vestibulum morbi porttitor platea metus vestibulum.Ante ullamcorper adipiscing.